Write It Into the Spec: Security Requirements Your Integrators Can Actually Meet
Your OT security standard says what good looks like. The specification is where it becomes something a supplier is paid to deliver. Integrators and OEMs build what the spec says. Good ones build it well. If your requirements aren’t in the RFQ, they aren’t in the quote, and they won’t be in the system.
In Part 1 we got security into the design conversation. This part turns that into requirements procurement can issue at every plant, the same way every time.
Why “must comply with IEC 62443” isn’t enough
Many RFQs carry one security sentence: the system shall comply with IEC 62443. The intent is right. The result is usually a vague proposal, because the standard is a family of documents covering products, systems, service providers and asset owners. The supplier can’t tell which parts you mean, at what level, or how you’ll check.
The standards are still the right foundation. IEC 62443-2-4 describes what to expect from integration and maintenance service providers. IEC 62443-3-3 covers system requirements, and IEC 62443-4-2 covers components. CISA and international partners have published Secure by Demand guidance on what OT owners should look for when selecting digital products. Your team can turn these into plain-language requirements a project engineer can verify.
One appendix, every plant
The most useful thing a CISO can give procurement is a short, standard OT security appendix that goes out with every control system, skid and packaged machine RFQ, at every site. It replaces plant-by-plant improvising with one consistent bar. It also makes supplier proposals comparable across the enterprise.
Keep it short and testable. Start with this set:
A short, testable OT security requirement set (a starting point for your standard RFQ security appendix)
| Requirement | Why operations benefits | How you’ll verify it |
|---|---|---|
| Unique, named user accounts; no shared or default passwords at handover | Clear accountability, easier troubleshooting | Account list reviewed at FAT; defaults tested at SAT |
| Unused ports, services and software removed or disabled | Fewer moving parts to maintain and patch | Hardening checklist signed at FAT |
| Remote support only through the owner’s approved access path | Vendor help is fast, logged and predictable | Path demonstrated at SAT |
| Network drawing, firewall rules and asset list with firmware versions delivered | Day-one asset inventory; faster fault finding | Turnover package review (Part 4) |
| Full backups plus a tested restore procedure | Predictable recovery time after any failure | Restore performed during commissioning |
| Supported operating systems and a defined process for vendor-validated patches | Planned maintenance instead of surprises | Support dates and patch process in contract |
| Notice to the owner when the vendor learns of a vulnerability in delivered components | Time to plan fixes during scheduled outages | Contract clause and named contact |
The middle column matters as much as the first. It’s how you explain each requirement to plant leaders in their own terms: uptime, maintainability and faster recovery.
Partner with procurement and legal
The appendix only works if it travels with every bid. That makes procurement your most important ally in this part of the lifecycle. Agree with them on when the appendix applies, who approves a supplier’s request for an exception, and how security gets scored next to price and throughput. (Our post OT Exceptions, Vendor Access, and Connectivity Expose Whether Governance Is Real covers keeping exceptions useful rather than permanent.)
With legal, get three terms into standard contract language:
- The owner holds the keys. All administrator credentials, licenses and encryption keys transfer at handover.
- Documentation is a deliverable. Drawings, configurations and backups are tied to payment milestones.
- Support has an end date you know. Contracts state how long components will be supported and patched.
Most suppliers welcome this. Clear requirements are easier to price than vague ones, and many OEMs already ship hardened builds and documented backup procedures. Ask them early what they deliver as standard.
What you can do now
Ask procurement for the last three control system or packaged-equipment RFQs issued across your plants, and compare their security language. You’ll likely find three different approaches, or none. Use the table above to draft a one-page OT security appendix, review it with one trusted integrator and your procurement lead, then publish it as the enterprise standard. Track one simple measure from then on: the share of OT RFQs that went out with the appendix attached.
Next in the series: Part 3, “FAT and SAT,” shows how acceptance tests you already run can become your strongest assurance evidence.
If you want help drafting your OT security appendix, book a consultation with one of our practitioners.