Skip to content

service · Engineering

OT security engineering

OT security engineering that survives a turnaround

Segmentation, hardening, and remote access built around outage windows. Design that operators will let you install during a planned turnaround.

how the engagement runs

  1. 01

    Target design

    We start from a target state designed against IEC 62443 zone and conduit modeling and sequence the work to your CapEx cycles and outage windows.

  2. 02

    Boundary and segmentation build

    IDMZ buildout and zone and conduit deployment, with each change planned around production and safety and scheduled into a planned outage window.

  3. 03

    Identity and remote access

    Identity controls and secure remote access for OEMs and internal teams.

  4. 04

    Detection and handover

    Detection platform standup, then handover to your team with runbooks, playbooks, and architecture decisions written inside your stack.

who does the work

Led by senior OT practitioners

  • Engagement lead

  • Lead assessor

  • Security engineer and architect

  • Analyst

See how each engagement runs

A segmentation design gets approved, and the first switch change waits for an outage window the plant has not granted. Remote access stays flat, and the monitoring tool sits untuned. The plant keeps the exposure the assessment found while the design waits in a deck.

Our security engineers build the controls the program depends on, on live plants. The work covers four areas:

  • IDMZ buildout at the IT/OT boundary.
  • Zone and conduit deployment against a target state designed with IEC 62443 zone and conduit modeling.
  • Identity controls and secure remote access for OEMs and internal teams.
  • Standup of the detection platform that monitors the boundary.

Each item traces back to the target state, so the controls that go in match the design leadership approved.

We sequence each change to your CapEx cycles and outage windows and plan it around production and safety. Plant-decision authority stays with operations. We recommend the change, and operations decides when it goes in.

As the work happens, we write the runbooks, playbooks, and architecture decisions inside your own stack. Your team receives them at handover with the controls already running, so your engineers can operate and change what we built.

The target design can come from an OT architecture and controls assessment. Security engineering is also one of the five workstreams in build-operate-transfer. Book a consultation to scope the first outage window.

after the engagement

The findings keep moving

Clients who want help running the fixes can put the findings in Resilion, the platform we use to run programs. Each fix gets a named owner at a named site, and the evidence lands as it closes.

See how Resilion works
Resilion task list with task IDs, sites, priority, status, and a named assignee on each task. Demo data.
Resilion · tasks routed to named owners · demo data

keep reading

FAQ

Questions about OT security engineering

What does OT security engineering include?
Implementation of the controls a program depends on: network segmentation and zoning, the IT/OT boundary and IDMZ, secure remote access, and monitoring, engineered and deployed on operating plants with the change discipline production requires.
Can you work on live production systems?
Yes. Our engineers deliver on running plants, planning changes around production windows and safety, so controls get built without taking the line down.

Talk to the people who do this work

Thirty minutes with a senior OT security practitioner. We confirm fit, plant scope, and who should be in the room. If it is not a match, we say so.