Skip to content

service · Assessments

Plant OT risk assessment in three weeks

What a plant OT risk assessment should produce

IEC 62443-3-2 high-level assessment in three weeks. Zones, conduits, and the exposures worth funding this year, named in plant language.

how the engagement runs

About 3 weeks, with 1 to 2 days on site

  1. 01

    Kickoff & Scope

    Half-day session with plant leadership, operations, and engineering. Critical processes, recent incidents, and known concerns surfaced. Scope confined to the questions leadership needs answered.

  2. 02

    Site Walk & Interviews

    One to two days on site. Network, HMI, control room, and remote access reviewed with the controls engineer. Operators interviewed. No active scanning, no production disruption.

  3. 03

    Risk Ranking

    Top consequences and risk paths ranked under IEC 62443-3-2 risk framing. Each risk tied to specific impact on uptime, safety, quality, or regulatory exposure. Quick wins and longer plays separated.

  4. 04

    Executive Brief

    Concise report and executive presentation delivered. Top risks named in plant language. Three to five priority moves with effort and indicative cost. Path to a detailed assessment if appropriate.

who does the work

Led by senior OT practitioners

  • Engagement lead

  • Lead assessor

  • Security engineer and architect

  • Analyst

See how each engagement runs

In about three weeks, with one to two days on site, this assessment shows plant leadership where the biggest cyber exposure sits and what to fund first.

We run the IEC 62443-3-2 high-level method against your site. We partition the system into zones and conduits, rate the risk to each, and surface the exposures that threaten production. On site, your controls engineer walks us through the network, HMIs, control room, and remote access, and we run no active scanning.

The executive brief names the top risks in plant language and gives three to five priority moves with effort and indicative cost. If you use Resilion, the findings land there as tasks.

When a move needs CapEx-grade depth, the detailed plant risk assessment models it zone by zone. The clause-level path for 2-1, 3-2, and 3-3 is IEC 62443 in practice.

after the engagement

The findings keep moving

Clients who want help running the fixes can put the findings in Resilion, the platform we use to run programs. Each fix gets a named owner at a named site, and the evidence lands as it closes.

See how Resilion works
Resilion task list with task IDs, sites, priority, status, and a named assignee on each task. Demo data.
Resilion · tasks routed to named owners · demo data

keep reading

FAQ

Questions about Plant OT risk assessment in three weeks

What is a high-level OT risk assessment?
A rapid IEC 62443-3-2 partition of the plant into zones and conduits, scored for the highest-likelihood, highest-impact cyber risks to production, designed to give leadership a fundable starting point without a months-long engagement.
How long does it take?
About three weeks, versus three months for a full detailed assessment. It is scoped to answer where the biggest exposure sits and what to fund first.
How long does an OT security assessment take and what does it cost?
A plant high-level risk assessment takes about three weeks, with one to two days on site. A program maturity assessment takes about six weeks and runs remotely. A detailed plant risk assessment takes about three months. Cost follows the number of sites, the days on site, and the depth, so Hillstrong quotes each engagement after a 30-minute scoping call.
How is it different from a detailed risk assessment?
The high-level pass finds and prioritizes the exposure; the Plant Detailed Risk Assessment then models loss-of-view and loss-of-control scenarios zone by zone with the depth a CapEx decision needs.

Talk to the people who do this work

Thirty minutes with a senior OT security practitioner. We confirm fit, plant scope, and who should be in the room. If it is not a match, we say so.