Handover Day: The Turnover Package Operations Will Thank You For

Hillstrong Group Security ·

Handover is the moment a new system joins your security program, or quietly doesn’t. The line runs, the punch list is short, and the project team moves on. If the right information changes hands that day, the new asset arrives already inventoried, owned and recoverable. If it doesn’t, your team will rebuild that picture later, one assessment at a time.

For a CISO, handover is the easiest point in the lifecycle to get complete, accurate data about a new asset. Everyone who built it is still on site, and everything you need was already produced in the earlier stages.

Seven items for the security section of the turnover package

Projects already deliver drawings, manuals and spare-parts lists. Ask for these seven items as part of the standard package:

  1. As-built network drawing and zone sketch, updated from Part 1 to match what was installed and checked at SAT.
  2. Asset register: every component with its location, role, firmware and software versions, and support end date. It goes straight into your enterprise asset inventory.
  3. Account and credential register: every account, its role and owner. Credentials go to your password vault through a secure channel.
  4. Backups and restore procedure, including the restore time measured at commissioning.
  5. Support and patching plan: vendor contacts, the approved remote access path, the patch process and contract end dates.
  6. Approved exceptions: anything the system couldn’t meet, with a compensating measure, an owner and a review date.
  7. A stop-the-line entry: what the new line can’t run without, who owns it, and its tested restoration time. If you keep a stop-the-line map, the line joins it on day one.

None of this is new work. Handover is where it gets collected, checked and assigned.

Make sure someone signs for it

A turnover package without a named recipient ends up on a shared drive. Before handover, agree who in operations owns the system’s security from now on, usually the area controls engineer or the site OT security lead. They sign for it the way maintenance signs for spare parts. Your team’s role is to make sure that name exists and that it’s in your records.

This is where the decision-rights work from our OT RACI post pays off. When ownership is already clear, handover is a signature, not a negotiation.

Plan the first 90 days

Add three security check-ins to the project’s hypercare plan:

  • Day 30: Review accounts and remove anyone who only needed access for startup.
  • Day 60: Compare a fresh backup with the commissioning baseline. Every difference should be an explained change.
  • Day 90: Run the first patch or update cycle through the agreed process, and record how long it took.

By day 90, the new system is running under your program’s normal routines rather than the project’s.

Why this scales

In 12 Plants, 12 Programs we wrote about how hard it is to get a consistent view across many sites. Turnover packages are one of the simplest fixes. If every new line and upgrade arrives with the same seven items in the same format, your enterprise view improves with each project, without a separate data-gathering exercise. If you manage your program in a platform such as Resilion, Hillstrong’s OT execution platform, handover is the natural moment for the new line to join it.

For board reporting, the turnover package also changes what you can say. Recovery times for new lines are measured, not estimated. Asset counts come from records, not discovery scans. Each project makes your numbers more reliable.

What you can do now

Ask engineering for the turnover package from the most recently completed OT project at one of your plants. Check it against the seven items above and note what’s present, partial or missing. Turn the result into a one-page turnover checklist, agree with your operations counterpart who signs for it, and ask engineering to add it to project closeout requirements. Then track one measure: the share of new OT assets that arrived in your inventory through a turnover package instead of a later discovery.

Next in the series: Part 5, “Modernize Without Starting Over,” shows how upgrades, migrations and retirements give existing plants the same fresh start.

If you want help building your turnover checklist, book a consultation with our team.

keep reading

next step

How does your program compare?

Answer eight questions and get a score out of 100 with a ranked list of gaps. It takes about two minutes, and you don't need to give an email to see it.

Take the OT execution self-check

Get the next post by email

By subscribing, you agree to receive the OT briefing by email from Hillstrong Group Security, Atlanta, GA. Unsubscribe at any time with the link in every email. See our privacy policy.

Talk it through with a practitioner

Book a 30-minute consultation, or read the long version in our free eBooks. No form.