Skip to content

service · Assessments

OT architecture and controls assessment

Does this plant OT architecture hold?

Zones, conduits, and remote access reviewed against IEC 62443-3-3. You leave knowing which paths would take a line down.

how the engagement runs

About 5 weeks, with 1 to 2 days on site

  1. 01

    Consequence Scoping

    Working sessions with operations, engineering, and safety leaders. Process groups ranked by the cyber-physical consequence of disruption. The functions the plant cannot lose are named before any asset gets scanned.

  2. 02

    Architecture Walk-Down

    Site visit with your controls engineers. Zones, conduits, and dataflows documented from production as it runs today. Passive collection only.

  3. 03

    Controls & Threat Mapping

    Targeted control testing against IEC 62443-3-3 and the SANS ICS Five Critical Controls. Each gap scored against cyber-physical consequence and adversary feasibility under NIST 800-30.

  4. 04

    Target Architecture & Roadmap

    Target state designed against IEC 62443 zone and conduit modeling. Remediation sequenced to your CapEx cycles and outage windows. Every line item costed to plus or minus 25 percent.

who does the work

Led by senior OT practitioners

  • Engagement lead

  • Lead assessor

  • Security engineer and architect

  • Analyst

See how each engagement runs

A heat map lands on the CISO’s desk with every cell colored and no costs attached. Finance cannot fund it, and a year later the plant runs the same risks it ran on day one.

This assessment measures your architecture against a defensible target aligned to IEC 62443 and the Purdue model. We review segmentation and zoning, the IT/OT boundary and IDMZ, remote access, and the controls protecting each level. Your controls engineers walk the site with us, so zones and dataflows come from production as it runs today.

We score each gap against cyber-physical consequence and adversary feasibility under NIST 800-30. The roadmap costs every line item to plus or minus 25 percent and follows your CapEx cycles and outage windows.

Once finance approves the plan, our security engineers can build it on the live plant. The clause-level detail behind the 3-3 testing is in IEC 62443 in practice. If you use Resilion, the roadmap lands there as tasks with owners.

after the engagement

The findings keep moving

Clients who want help running the fixes can put the findings in Resilion, the platform we use to run programs. Each fix gets a named owner at a named site, and the evidence lands as it closes.

See how Resilion works
Resilion task list with task IDs, sites, priority, status, and a named assignee on each task. Demo data.
Resilion · tasks routed to named owners · demo data

keep reading

FAQ

Questions about OT architecture and controls assessment

What does the architecture assessment review?
Network segmentation and zoning, the IT/OT boundary and IDMZ, remote access, and the security controls protecting each level, mapped against a reference architecture aligned to IEC 62443 and the Purdue model.
Why do most architecture reviews fail?
They end as a heat map and a stack of recommendations that cannot survive a CapEx review, so the plant runs the same risks a year later. We tie every gap to consequence and a costed, phased plan finance can fund.

Talk to the people who do this work

Thirty minutes with a senior OT security practitioner. We confirm fit, plant scope, and who should be in the room. If it is not a match, we say so.